610-797-2225 info@summitutilitystructures.com

Highlighted Projects

Renderings

A shortlist of some of our management team’s most notable projects include:

1) New Brunswick Power – 345KV Electric Transmission Line, Tubular H-Frame Structures designed for helicopter installation and utilizing all steel foundations to limit environmental impact on Right of Way.

2) Alleghany Power (First Energy) – 500KV with 138KV Underbuild Tubular H-Frame Structures designed to utilize existing Right-of-Way to allow expedited construction of major East to West power delivery reliability issues.

3) DelMarVa Power (PEPCO) – 230KV 200 feet tall Tubular H-Frame Structures providing single span crossing of the C&D Canal, a major shipping corridor connecting the Chesapeake and Delaware Bays.

4) Ketchikan Public Utilities (Alaska) – 138KV Tubular Y-Frame Single Base Structures designed for helicopter installation and utilizing all steel Micro-Pile foundations to minimize environmental impact on high elevation Right-of-Way. Delivered and fully assembled on barges prior to flying to site for helicopter erection.